Online services
News
  1. Home
  2. Solution Consultancy Gold Plants

Solution Consultancy Gold Plants

2020-5-21The procedures and tests descriptions are given for the ultimate gold carbon loading tests and the dynamic gold carbon loading tests. A 4.5 parts per million gold solution was prepared by dissolving fine -200 mesh gold powder in a sodium cyanide solution made with deionied water at pH 10.5 lime adjusted. This gold feed solution was fed by a metering pump at a rate of 2.5 mlmin. to

Get Price ListChat Online

Product News

Last News

Contact Us

High and New Industrial Zone, Kexue Revenue, Zhengzhou, China

[email protected]